Curriculum vitae
b. f. l. d. fernando
BOTHALAGE FREDRICK LESLIE DONATIOUS FERNANDO
Claim Consultant/Sr.Quantity Surveyor/Cont.Admin.
| ||||
Experience
| ||||
Claim Consultant SQS –EdificePromc (Claim management Co.)-short term assignment-/ ALGHANIM INTERNATIONALVs Petrofac Vs KOC collaborate with edificePromac
The State of Kuwait
May 2017 – to Aug. – Framing and preparation of claims for Al Ghanim int’l subcontractor of LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM (PHASE 1), KUWAIT- ALGHANIM INTERNATIONAL CLIENT /PETROFAC: KUWAIT OIL COMPANY
FREELANCE WORK - PROVIDING/PREPARING OUTSOURCE WORK FOR CONTRACT SOLUTIONS/QDVC/DOHA
2017– arranging and managing of preparation of BOQ’s for Infra work for tendering/bidding (specially IAMD WKS.) purposes with around 12 in number of QS’s in different disciplines/capacities/seniority and finalizing the same as required target dates say using around more than 2000 pdf drgs (amended drg. say around another 1000 in pdf) mode and say around more than 8000 pages of spec in pdf mode..
All below in the State of Qatar for 2014-2015 working with QS service provider of Contracts Solutions as and when requirements from various Co’s CS will supply the services…
In Qatar from 2014 to date working along with QS service provider namely Contract Solutions in below Co’s as they want our(CS’s) services
SQS –QDVC
The State of Qatar
May 2016 – to Sep’2016 – all post contract works at the moment around the ongoing project and assisting PM/Cont.Administrator for the EOT and other Claims etc., and any variations updating for CP 1-C1 C2 &C3 transfer Packages for QR.338Ml.cont.sum M&E plus Civil wks.
SQS –FrijnsME(Qatar) structural steel Co.
The State of Qatar
Nov 2015 – to May’2016– all post contract works at the moment around ongoing projects 20 in nrs and assisting PM’s for the EOT and other Claims etc., and any re-conciliations needed
n
ESTIMATOR/SQS – CONTRACO Co./A GRADE CONTRACTOR
The State of Qatar
August 2015 – 3mths – working in tendering/estimate department under Technical Manager
SQS –DESIGN & BUILD ID WORKS FOR TJ PALACE MANSION IN DAFNA ISLAND HIGH-QUALITY SPEC MARCH & WHITE
The State of Qatar
March 2015 – August – Contract Sum QR.185 Million 16 MONTH PROJECT Design & Build FIDIC Conversion Ala-Manna Construction/Bluu Qatar(Design)- looking, after all, QS Functions work with supervising of one another QS’s plus working along with the Design Director(Architect)
SQS –DESIGN & CONSTRUCTION NEW ORBITAL HIGHWAY &TRUCK ROUTE (P023)CONTRACT 2: ORBITAL HIGHWAY: Salwa Road to North Relief Road
The State of Qatar
June’ 2014 – March 2015 – Contract Sum QR.4.25 Billion36 MONTH PROJECT Design & Construct FIDIC ConversionJv -QDVC/ Bin Omran- looking after the claims sending NoE’s and further actions -and all other QS related work with supervising of two another QS’s plus working along with the Contracts Engineers who are working for S/C. docs.
Chief QS/Contract Advisor/Contract Administrator – TEAM Company ( Temporary Assignment on Claims)
Srilanka
May’ 2010-mid Jul’2010 - Road Project In Eastern Area for Totaling Rs.350Ml. Muthur Road Project under FIDIC form of contracts. TIIP French Loans with SL Govt.
Contract Administrator(Mgr.Contracts) - Consulting Engineers & Contractors
Srilanka
Dec’2007 – May’ 2010 - Road Projects In Northern Area for Totaling Rs.3000Ml. scattered in 4 different Projects Some are under FIDIC and ICTAD(Local) form of contracts. Some are ADB and CARRP/TAARP Loans with SL Govt. Funding and purely on Foreign Funded too.
Free lance work in Sri Lanka
n Water works @ Kandy – Final account finalisation
n Private villas/Warehouses @ Negombo/Katunayaka Free Zone -- Valuations
n In Road works @ Colombo/Matara super highway – EOT Claim
n Flyover @ Urugodawatta Railway - Contractual aspect
June’2006 – Oct.’2007 Gardiner & Theo bald Int’l UAE
Contract Adviser to CHI Development Group (CHI) in the capacity of Senior QS - Dubai(UAE)
May’2007 – 121nos. of Individual Separate Villas in Jumeirah Golf Estates called “Lime Tree Valley” (LTV) by 2 Phases by Separate two Contractors under FIDIC Orange Book Turnkey Contract form
Contract Adviser to Project Management (edara) in the capacity of Senior QS
June’2005 – May’2007 (Short Assignment) AWRC (Small Road Contractor )DM Contract UAE
Chief Quantity Surveyor
2003–June’2005 MT Hojgaard a/s(Danish Co.) Sri Lanka/Maldives
and Maldives (only for FIDIC Claims)
Chief Quantity Surveyor/Financial QS
2001–2002 Burhan Kuwaiti Trading Co., State of Kuwait
Project Quantity Surveyor.
1998–2001 Kumagai Gumi Co., Sri Lanka
Senior Quantity Surveyor.
| ||||
1997–1998 Sri Lanka Army Volunteer Force 4th Engineer Regiment
Commissioned Officer now demobilized
| ||||
1995–1997 Gulf Housing & Const., Co., State Of Qatar
Quantity Surveyor.
| ||||
1993–1995 ITASRI JV.Gambogi -Italian/Srilankan joint venture Sri Lanka
Chief Quantity Surveyor
1991–1993 EEC funded agriculture pilot project Sri Lanka
Civil Eng. Consultant/Community Development Facilitator
1986–1991 Sri Lanka Army Volunteer Force 4th Engineer Regiment
Commissioned Officer
1985–1986 Bahawan Contracting co., Sultanate of Oman
Quantity Surveyor
1984–1985 Bonna long power Eng., Co., Sri Lanka
Project Coordinator
1983–1984 Costain Int., Victoria project Sri Lanka
Quantity Surveyor
1980–1984 George Wimpy int., Hash-mite kingdom of Jordan
Quantity Surveyor
1980 Sri Lanka Transport Board Sri Lanka
Building Inspector
1974–1980 Irrigation Dept., Sri Lanka
Draughtsman
| ||||
professional memberships &?
Awarded from Canadian Institute of Quantity Surveyors but not enrolled
Associate Quantity Surveyor CIQS (Member ID 248928)
Education &
| ||||
§ From 2009 Jul. Following a E-Course on Human Rights( 1 Year) leading to 4 year LLB by Colombo University Law Faculty Sri Lanka
1975–1979 Part time Moratuwa University Sri Lanka
n Building Construction Part 111.
n NCT Quantity surveying (Moratuwa University) held up due to Jordan employment
1973 Govt. Technical College SriLanka
n Draughtsman apprentices course
1960-1973 St. Benedict’s College Colombo SriLanka
n Up to science A/L and joined govt. technical college
| ||||
COMPUTOR Literacy (soft/hard ware) /Motor DRIVING LICENCE :
■ MS. office/excel/proj./win 95/off.97/primavera /CCS
■ Computer Hardware Engineering
■ DL: Sri Lanka/Sultanate of Oman/State of Qatar /UAE(Valid to 2015)
| ||||
COUNRIES TRAVELLED Q
| ||||
■ INDIA, JORDAN, ITALLY, FRANCE, OMAN, QATAR, UAE, UK, KUWAIT, MALAYSIA & MALDIVES
| ||||
married status
| ||||
■ Married-
2 out of 4 children, married
| ||||
passport/national i.d. details Q
| ||||
■ PP No. N 0952385 Validity. 15.02.2018
| ||||
■ National ID No.531151097 V
referees
|
■ Mr. Ranjith Fernando Deputy Chief Civil Engineer Biyagama IPZ
■ Now Director Katunayaka IPZ/Special 300 factories construction
■ Maj. Gen. Bani Zoysa SLE. Deputy Commandant, Vol Force SL Army
Sex
| ||
■ Male
| ||
date of birth J
| ||
■ 27. 04. 1953
| ||
othernames & surname■ Bothalage Fredrick Leslie Donatious FERNANADO
| ||
Following are familiar and executed my me as a QS :All in Pre & Post Contract
Post Pre
: Preparing of Valuations/monthly progress claim - Preparing of Contract Document
:S/Contractors payment certificates - BOQ documentation with Preambles etc.,
:In Lieu of Electro Mechanical S/C’s valuations
prepare for main contractor’s - Specialist Documents - Tender
Document with agreements etc.,
: Negotiation of Electro Mechanical claims
with S/C - Documentation of Specifications as an
according to the Drgs. & other
requirements
: Extension of time claim - EOT - Tender Evaluations
:All claims under FIDIC -
:Insurance claims
Method of measurements and other related Contract Forms of documents
:FIDIC/ICTAD(Local Srilanka)
:SMM
:CESMM
:POMI
Attend a Seminar one day (at Hilton Colombo) by David Price of James R.Knowels on Practical Explanation of the New FIDIC Contracts
Projects under Co.,’s
TEAM Company
Preparation of Claims to CHEC Main Contractor all EOT and other related FIDIC entitlements. (2 ½ mths temp. work)
CEC- Consulting Engineers & Contractors
All together 100km Asphalting/DBST of road works scattered in different projects but all are in Northern area (War zone area) some are FIDIC form of contract and others local converted forms totaling to 3000 Ml Rs.(SL) mostly handling EOT/Delay analysis claims etc.,
Gardiner & Theobald Int’l
Lime Tree Valley 121 Villas in 5 different types to build by two separate contractors under the FIDIC Turnkey Form of Contract duration spanning to 18 mths. Based on Architect’s Concept design, and Employers requirement agreed at overall Dhs.290 Ml. with the option of buyer’s changes to their villas also look after by Client basically as a Developer but with owner and bank as a consortium. To advice the client in all contractual aspects, pertain to the financial impact.
Uptown Mirdif Development Employer: UNION PROPERTIES PJSC-Project Manager: edara LLC-Design Consultant: Khatib & Alami – Consultant Quantity Surveyor: Gardiner & Theobald Int’l -Contract Sum: Dhs.700 Ml. Consisting of 375 nos. of apartments plus all other facilities to the entire development Project—Looking after the GTI roll as QS Practice/Advising PM and day to day contractual aspect plus maintains the QS Department with other two QS’s
AWRC(UAE) Chief Quantity Surveyor(Short term)
Various Improvements in Dubai Phase II Project: - Inner CBD,Outer CBD,Rest of Dubai Road works for DM Contract Sum UAE Dhs.104 ML .- Consultant: ITAL Consult
MTHojgaard a/s(SRI LANKA) Chief Quantity Surveyor
Sri Lanka Coastal Protection Project: - Revetments, Groynes, Dredging (Sand Nourishment) and Piling work includes Concrete Capping. Contract Sum SLR 2395 ML. Under ADB & SLGovt. Funding.- Consultant: NIRAS port consult.
Maldives:- Villingily Harbour Project US $ 25Ml Handling only claims
- Consulting Engineering Center/ Kuwait Consulting & Investment Co
Burhan Kuwaiti Trading Co.,(STATE OF KUWAIT)Project Quantity Surveyor
KNPC Project: - Construction of Buildings for KNPC Civil Eng.Contracts Dept., namely Main Building Four storied, Training Centre And Canteen building. KD
Kumagai Gumi Co.,(SRI LANKA)Senior Quantity Surveyor
Baseline Phase I Project: - Construction of six lanes Highway with Over-head bypass of 0.750km for main Railway lines including under ground pedestals Tunneling for a main Junction consisting of 9. 5km long road works including the existing services upgrading for water, Electricity, Sewer and Telecom. Contract Sum SLR 3999 ML plus Variations SLR 2578ML. Under ADB & SLGovt. Funding. – Consultant: Nippon Koi.
Sri Lanka Army Vol. Force.Brigade HQ Engineering Rep.
Participation in “Jaya sikuru” Operation with LTTE control area to capture the(from Vanni to Elephant pass) MSR(Mian Supply Route) as a sapper officer with one of the Brigade in marching forward.
Gulf Housing & Const, Co.,(STATE OF QATAR) Quantity Surveyor
All Post contract QS work for all projects. (a).QGPC Steel Warehouses project for Chiyoda Corporation (b). QNB Branch buildings 5 nos. at different locations in Qatar (c).
Itasri JV., (SRI LANKA)Chief quantity Surveyor
3rd Road Rehabilitation Project- Consultant Scott Wilson & Ptnrs.
EEC Piolet Project (SRI LANKA)Civil Engineering Consultant
Cost Effective Infrastructure for Farmers at all District.
Sri Lanka Army Vol. Force Commissioned Officer(Sapper/Engineer officer)
Construction of Battalion Complex at Vanni Brigade,Boosa Battalion Complex at Southern Command, Ranaviru Sevana Bulding Complex at Ragama,Project Officer and Maintenance Officer of the Gen. Sir Johan Kothalawal Defense academy (for Three Forces-Extent of 51 Acres).
Bonna Long Power(SRI LANKA)Project Co-Ordinator
Mahaweli System “C” school Buildings in Batticalo/Pollonaruwa Districts.- Consultant Mahaweli Eng.Consultancy Burea
Bahawan Const, Co.,(OMAN) Quantity Surveyor
Director General of Finance Building, and in house projects for SSB(South Suhail Bahawan)- Consultant Barker Barton & Lawson
Costain Int.,(SRI LANKA) Quantity Surveyor
Mahaweli Accelerated Program Victoria project Power house
George Wimpy Int.(KINGDOM OF JORDAN) Quantity Surveyor
Arab potash project Saffi, Karak, Alu-Swiss project Steel warehouses with portal fdns. Aqaba, Ro-Ro berth project Aqaba Sea Port, Cement berth facility Aqaba and Amman King Hussein’s Chalets. - Consultant Sir Alexander Gibbs & Partners, Consultant Scott Wilson & Partners
Sri Lanka Transport Board Building Inspector
Construction of new 100 bus depot at Godakawela in Ratnapura District,Construction of 50 bus depot at Kalawana in Ratnapura District
Irrigation Department(Sri Lanka) Draughtsman
Blocking Out & Planning, Estimation, Structures Preparation of BOQ & Estimates for Irrigation works including reservoir Dams,Canals etc.,
My Web Page: http://bothalage53.host22.com/



B.Fredrick L D Fernando
53,JFG Mw., 4th Kurana
Negombo, Srilanka
22 Oct. 2017
I am well experienced with the all aspects of QS functions, from Pre to Post contract plus most of the method of measurements such as SMM/CESMM/POMI in new updates etc.,and it’s spanning to over an above 40 Years ( 1973~2017).In the same trade I have been expertise Civil Draughtsman, Building Inspector, Project QS, CQS plus Volunteer Army carrier as an Officer of an Engineering Co., of Sri Lanka Army Volunteer Force where even participated in front engagement with enemy as sapper officer - totally from 1973 to 2017 in all kinds of constructions, areas of minor to major with all civil works ,road works ,marine works, villas & buildings with retails/commercials/mixed plus Oil & Gas.
My specialty is mainly on FIDIC (Red/Orange/Silver books) contractual management & all contractual correspondences are in very much high and with the Profit & Loss (Internal Valuation), cost report computations too, where you can gather from my CV itself. So, if you are really caliber me,
Pls. contact on my Mob. No. +94 77 6263382 begin_of_the_skype_highlighting +94 77 6263382 end_of_the_skype_highlighting (or e-mail to fredrick217@yahoo.com and fredrick217@gmail.com) for further discussion etc., to consider any opportunity with your organization.
Adding to the above recently, I have been approved for the membership from Canadian Institute of Quantity Surveyors as Associate Quantity Surveyor (Associate Quantity Surveyor CIQS) –but up to now didn’t enroll to the same, In GT actually I, replaced a British expatriate in edara project management Mirdiff Uptown project in the capacity of adviser to the Project Management as SQS position and total responsibility for GT/edara. The last project with GT was Lime Tree Valley Jumeirah Golf Links for CHI Project Management.
Though, I am not a western educated or degree holder (but University certificate holder) & you can judge by my cv to ascertain the capability of mine in this field.
Actually, I came from the ladder starting as a Draughtsman to Claim consultant.Exploring and got exposure to most of the Engineering trades incl Oil & Gas
Availability : no notice
Cheers
Fredrick
Fredrick
Sri Lanka
My Web Page:http://bothalage53.host22.com/
Note: Pls. contact these Tel. nos. Land Tel.+94 31 2232916 begin_of_the_skype_highlighting +94 31 2232916 end_of_the_skype_highlighting, mob. +94 77 6263382 begin_of_the_skype_highlighting +94 77 6263382 end_of_the_skype_highlighting
.
)
no. 53, John F Gunaratna Mw., 4 th Kurana. NEgombo.
SRI LANKA e-mail:fredrick217@yahoo.com My web page: http://bothalage53.host22.com/ •Land Phones 0094-31-2232916 begin_of_the_skype_highlighting 0094-31-2232916 end_of_the_skype_highlighting
Mobile 0094-776263382 begin_of_the_skype_highlighting 0094-776263382 end_of_the_skype_highlighting
|